Hearken to this text |
NASA’s Artemis Program plans to ship people again to the moon to determine a lunar floor base and house station. Referred to as Gateway, the house station will likely be powered by the Energy and Propulsion Factor, or PPE, module, which makes use of giant arrays of superior, multi-junction photo voltaic cells to generate 60 kilowatts of energy.
To make sure the PPE’s success, it’s essential to check the photo voltaic arrays with superior simulation that replicates daylight and measures every circuit’s efficiency. Engineered by Angstrom Designs Inc., the photo voltaic simulator heads should be positioned at quite a few factors alongside the size and width of the photo voltaic arrays.
That course of that’s often completed utilizing automation frames that encompass linear movement phases. As a result of the PPE’s photo voltaic arrays are so giant, normal frames constructed for typical array sizes couldn’t present the required vertical and horizontal movement.
Bell-Everman designed, engineered and fabricated a customized movement system that allows the Angstrom Designs photo voltaic simulator heads to check the PPE’s photo voltaic panels. And to make sure that the simulator heads are totally calibrated, we additionally constructed the I-formation gantry robotic that calibrates and validates the simulator efficiency in opposition to photo voltaic cell requirements.
Right here’s a deep dive into the mechanical challenges of assembly the movement system’s particular necessities.
Bell-Everman finds essentially the most cost-effective design
An early design featured two bending tracks — one on the bottom and the opposite roughly 30 ft. excessive close to the highest of the panels. The tracks would help the LED photo voltaic simulators — a 3,500-lb. load — permitting them to check one deployed array, then go across the bend and check an array on the opposite aspect of a large scaffold construction.
However this answer, which might function like an I-formation gantry, required specialised bearing programs. This elevated design complexity and rapidly drove the venture past price range, given the peak and cargo necessities.
In its place design, Bell-Everman engineered a movement system that makes use of a cellular base for X and Y motions, and a servo-controlled Z to boost the photo voltaic simulators up a three-story tall vertical tower. This mobile-robot gantry design was essentially the most cost-effective choice and drastically lowered system complexity.
Body, movement system should keep upright
As a result of photo voltaic simulator payload, the whole body of the mobile-robot gantry needed to bear a variety of weight and maintain the simulator LED arrays parallel to the photo voltaic array. This required a big quantity of finite ingredient evaluation to make sure the subframe may stand up to the forces of hoisting the load — and survive a seismic occasion with out toppling over.
Additionally, the totally constructed movement system is giant and should be capable of make a flip across the finish of a deployment construction in a really tight flooring plan.
Initially constructed to check the PPE’s panels, NASA can proceed to make use of the movement system to check future space-going applied sciences.
Heavy cantilevered lifting handles forces
The 240 photo voltaic simulator heads are nested in a pantographic morphing array in three balanced pivoting segments, which transitions between two preparations: a 2-by-18-ft. grid and a 6-by-6-ft. grid. Because the array actuates, it imparts excessive second forces on the movement system’s body.
To accommodate these forces, we used heavier-than-usual linear bearing rails and crossed curler bearings with an 8-in. bore to cross Ethernet communication and 40 kW {of electrical} energy per section.
The array and morphing construction signify a 3,500-lb. cantilevered load on the vertical tower, requiring a counterbalance to each stability second hundreds on the tower and supply one thing near impartial buoyancy.
Gross motion of the mixed payload and LED array is offered by a ten,000-lb. drum hoist. To realize vertical movement, a single ServoBelt Heavy Linear is used with Bosch Rexroth drives and huge redundant cables.
The counterbalance design ensures that the vertical drive solely sees a weight imbalance of fifty to 300 lb. — greater than sufficient respiration room for the ServoBelt Heavy LoopTrack drive, which might accommodate as much as 600 lb. of linear pressure.
Additionally, because of the counterbalance, any drive failure wouldn’t lead to dropping this useful load. Threading these cables by pulley redirects allows the counterweight and payload to be raised collectively to their mid-height from a parked place on the backside.
This fascinating and totally redundant cable structure permits full impartial buoyancy all through the vary of the coarse positioning hoist.
Tower constructed piece by piece
The vertical tower supporting the photo voltaic simulator load will attain three tales excessive when totally constructed. As a result of it was too tall to suit contained in the constructing the place it was made, the tower was inbuilt three items.
We made a shorter counterbalance cable set to permit the underside part for use for full practical testing inside the low ceiling of our meeting bay.
Because the carry travels up the finished vertical tower, any vibrations induced by imperfections the place every part is linked would have an effect on the simulator efficiency and diagnostic high quality. We joined every tower part with a particular multigenerational technique of splicing, much like our long-travel gantry programs. These common splicing joints allow easy vertical movement throughout the splices.
Z-axis automation for getting round
The movement system’s actuation is operated by hand aside from the Z-axis journey, which is totally automated. Due to the excessive worth of space-going photo voltaic arrays like this, it is much better to manually transfer axes of movement which have any probability of damaging the array.
An electrical-powered tug pulls the whole system for big actions, together with when the system is faraway from or put into storage. When the system is introduced close to the PPE photo voltaic array, advantageous changes are made with lever arms hooked up to the system’s wheels. When the proper place is achieved, screw toes are lowered to the ground.
Electrical system designed to keep away from flames
As a result of the simulator homes 240 of the 500-watt pLEDss heads, a big problem of this venture was managing over 120 kW of energy.
That includes many breakers and branches, {the electrical} system is designed to forestall overheating and hearth harm ought to shorts happen at any stage.
Calibration system is separate
To make sure that Angstrom Designs’ programmable LED photo voltaic simulators (pLEDss) carry out efficiently, they should be calibrated in opposition to photo voltaic cell requirements referred to as isotypes.
We additionally designed a calibration system for the PPE photo voltaic simulator to check in opposition to, consisting of an I-format gantry that homes the photo voltaic cell isotypes.
Referred to as the “Calibot,” this I-frame gantry robotic is able to calibrating the pLEDss heads whereas the system is in both morphing place.
When the Calibot is maneuvered to the pLEDss tester, management packing containers are linked, and docking mechanisms protect the optimum standoff distance throughout calibration. Each the PPE simulator system and the Calibot will likely be saved with NASA in the identical facility.
The pantographic morphing array consists of three smaller subarrays that every comprise 80 pLEDss heads. Every subarray has its personal terminal blocks and cables.
Every head’s DC energy provide is delivered 220 VAC to permit using smaller 18-gauge energy wires. Due to the quantity of harnessing, it is very important scale back weight and house for the almost 400 cables operating to the breaker packing containers.
Based mostly on the early I-format gantry design — which wanted to make a U-turn across the help scaffold holding two photo voltaic arrays, a flooring mounted cable observe and a information system — the entire value for the ability supply alone was estimated to be roughly $200,000.
Due to the mobile-robot gantry design with easy extension cordage, this expense was lowered to $6,000 and solely 150 toes of cable.
All the venture may have been completed with a big, track-based I-format gantry. However Bell-Everman simplified the design with cellular gantry robots, considerably decreasing system complexity and prices.